Systems Engineering folios

Assessment Criteria

Criterion 1

Investigation of a problem/situation/opportunity/need and develop a design brief for an integrated controlled system including evaluation criteria

Criterion 2

Researching, devising, designing and modelling design options

Criterion 3

Planning the creation of the system

 

Criterion 4

Use of tools, equipment and machines to make the system

Criterion 5

Realisation of an integrated controlled system

Criterion 6

Use of diagnostic test procedures and interpreting test data

Criterion 7

Project management to realise the preferred option

Criterion 8

Evaluating the use of the systems engineering process, including finished, integrated controlled system

This folio page evaluates the success of Luke Bouwmeester’s integrated controlled system ‘Solar Tracking Parabolic Mirror’.
Luke Bouwmeester, Systems Engineering, Criteria 8

 

Join the mailing list and get the latest from our Museums direct to your inbox.

Share your thoughts to WIN

We'd love to hear about your experience with our website. Our survey takes less than 10 minutes and entries go in a draw to win a $100 gift voucher at our online store!